Wednesday, June 25, 2008

Reflections

The glass has gone in the storefront!

Is that one of the reported ghosts in the window - Oh, maybe it is just Richard.


The live/work lofts are coming along!

Tuesday, April 29, 2008

701 Updates

Things are taking shape inside and out of 701.
This is the new stairwell that is on the back west wall.

New copper piping.

The impressive turn buckle trusses and new beams upstairs.

This view is of one of the lofts in progress and you can see where the old bead board ceiling meets the new roof.

When you consider all the progress, updates and renovations that have taken place in the past year it really is amazing how this building is getting new life.

Monday, March 31, 2008

Olympia Festival, April 19th





Come out to the neighborhood and enjoy music, food and fun for the whole family!
April 19th, from 11:00 - 5:00

Friday, March 21, 2008

Store Front



Got a nice view with the fencing down of the store front.


Remember this look?



Zoom in on the below photo to see the bird in the pipe.
He may have to find a new home soon.

Monday, March 10, 2008

The Front is Taking Shape





Several new items of interest are happening at 701.
We have completed the storefront framing. The new framing consists of tube steel welded to plates on grade and the I-beams up top, which are part of our seismic upgrades to the front facade. These make for an incredibly strong framing structure.







And of course, the part that the public will eventually see - the final millwork that wraps the steel and becomes the new "front facade", is ready. After months of review and changes, the final trappings of the new storefront are finally going in. Shenandoah has installed a mock up on the east corner. Dan Elswick with the South Carolina Department of Archives and History will be on site this month to review the mock-up in order for us to proceed with the final millwork details.
All of the bead board on the 2nd floor has been re-installed and the old crown molding which Hood painstakingly saved is being reinstalled on the 2nd floor this week.

Lowery Painting is beginning to paint the bead board and beams on the top west side.
Rough-ins continue on plumbing and electrical and as they complete, drywall is being hung. So far, drywall has been installed on all of the exterior walls of the 2nd floor and on one wall of each of the demising walls in the lofts.
All new HVAC units have been set up on the roof.
The elevator has been delivered and is waiting for final utility hook-up to be installed.
Four of the remaining secondary entrances have been completed and are ready for installation. T
Our new pad for SCANA's transformer is being poured this week so that the utilities can be connected in the next couple of weeks. We are bringing the new utilities for 701 in underground and getting rid of the unsightly power poles and electrical drops to the buildings.
The old Colonial Printing building next door, which we bought last month has been torn down to make way for our site improvements and parking.

Our new site plan - plantings, etc. are nearly complete. We had the final meeting with the city and got the go ahead for Mark Cotterill's design.
Stay tuned for further updates on all of the new advances being made!

Monday, January 7, 2008

New Year/New Progress



Notes From Richard
I can't believe that 2007 is over. 701 has had a busy year - first, from a clean it out so that you can see what you've got perspective and then a design it, build it and they will come perspective.
Everyone involved has worked hard on this unique project this year. Careful consideration has gone into every decision made and I'm proud to be a part of this team.
My stated goal in late May was to be substantially complete with the structure - new steel in place, roof on, windows in and storefront in place. General life safety issues taken care of and the building be ready to show possible tenants - even start working on some tenant build out.



Well, I've always been a bit of an overachiever...

If you were to stop by for a visit, this is what you would currently see...

Loft live/work framing in



Electrical rough-in
Plumbing rough-in
New wall framing downstairs (interior walls)


New exterior wall framing
Gutters and downspouts being installed
Sprinkler piping being installed
Windows on the top east side going in

Interest from possible renters remains strong, however, we are still not quite ready to write leases.

If any of you would like to take a look around, please don't hesitate to call. I'll be glad to give you a personal tour!

Wednesday, September 5, 2007

Hard Hat Tour


Historic Columbia Foundation
is offering a SPECIAL TOUR of 701 Whaley.
September 20, 2007
5:30 p.m. - 7:30 p.m.

Take a behind-the-scenes look at the restoration process of the building that was once one of the most popular gathering sites in the historic Olympia Mill neighborhood. Historic Columbia Foundation and Garvin Design Group will host a reception immediately following the tour at the Granby Mill Administration Building, located at 339 Heyward Street.

For reservations, please call 803.252.7742, ext. 29 or email reservations@historiccolumbia.org

PROGRESS REPORT FROM RICHARD
THINGS ARE MOVING FAST!


Many parts of the total project are currently underway. They include:
The steel structure for the interior section on the east side is nearly up.




The concrete block in-fill on the front lower facade has been removed.



The old roof on the west side is currently being removed in order to start the new roof membrane.
Windows on the west side are wrapping up and the plywood will come down in a few days.
The upstairs front facade windows have had new lintels installed.

The brick masons have nearly completed the west side repairs. Charlie Thompson and the Guignard family have graciously donated brick harvested from a building built during the same time period. These brick have allowed us to blend the repairs into the current brick facade. They look great!
In the next few weeks, we hope to accomplish several key parts. They include,
Setting roof top curbs for the HVAC units.
Completing the new roof on the west side. Finishing the new roof deck on the east side.
Having the new second floor deck (east side) in place.
New structural framing for the lower front facade windows.
Initial underground plumbing and electrical rough-ins underway.
New windows installed on the upper front facade.
Old in-fill on the east side (windows) removed.
There will be numerous other projects underway this month and as October and cooler weather come our way, we will see significant changes as the building starts to morph towards occupancy.

This is going to be an incredible space. A great view of the church steeple and mill and an enormous window to the east.


As always, if any of you would like to take a look, I am available to be your guide. Feel free to forward this site on to the growing number of fans interested in 701!

Richard

m: (803) 414-9450
f: (803) 254-1456